Please use this identifier to cite or link to this item:
https://ah.lib.nccu.edu.tw/handle/140.119/100710
題名: | Cost Effectiveness of Using a Correlated Variable in a Complete Inspection Plan When Inspection Error is Present | 作者: | 唐揆 Tang, Kwei;Schneider, H. |
貢獻者: | 企管系 | 日期: | Dec-1990 | 上傳時間: | 24-Aug-2016 | 摘要: | Due to advances in automated manufacturing systems and automatic inspection equipment, complete inspection (screening) has drawn increased attention recently and has become a widespread practice. Screening can be based on the performance variable of interest or on a variable which is correlated with the performance variable. Using a correlated variable as the screening variable is attractive when the inspection on the performance variable is destructive or costly. The purpose of this article is to illustrate both theoretically and empirically when a correlated variable rather than the performance variable should be used as the screening variable when inspection error is present. | 關聯: | Naval Research Logistics, 37(6), 893-904 | 資料類型: | article | DOI: | http://dx.doi.org/10.1002/1520-6750(199012)37:6<893::AID-NAV3220370608>3.0.CO;2-B |
Appears in Collections: | 期刊論文 |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
index.html | 162 B | HTML2 | View/Open | |
index.html | 76 B | HTML2 | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.