Please use this identifier to cite or link to this item: https://ah.lib.nccu.edu.tw/handle/140.119/100724
DC FieldValueLanguage
dc.contributor企管系
dc.creator唐揆zh_TW
dc.creatorTang, Kwei;Schneider, H.
dc.date1987
dc.date.accessioned2016-08-24T09:42:27Z-
dc.date.available2016-08-24T09:42:27Z-
dc.date.issued2016-08-24T09:42:27Z-
dc.identifier.urihttp://nccur.lib.nccu.edu.tw/handle/140.119/100724-
dc.description.abstractIn a complete inspection plan, every incoming item is subject to variable inspection. If the inspection result indicates that an item fails to meet predetermined specification limits, the item is reworked so that its quality characteristic is exactly equal to the target value. The specification limits are determined by the tradeoff among the cost incurred by imperfect quality, cost of rework and cost of inspection. The economic and statistical effects of inspection error on the complete inspection plan are investigated. Two models with considerations of inspection error are developed under different rework schemes, then compared with the model without inspection error consideration.
dc.format.extent124 bytes-
dc.format.mimetypetext/html-
dc.relationIIE Transactions, 19(4), 421-428
dc.titleThe Effects of Inspection Error on a Complete Inspection Plan
dc.typearticle
dc.identifier.doi10.1080/07408178708975415
dc.doi.urihttp://dx.doi.org/10.1080/07408178708975415
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.openairetypearticle-
item.grantfulltextrestricted-
item.cerifentitytypePublications-
Appears in Collections:期刊論文
Files in This Item:
File Description SizeFormat
index.html124 BHTML2View/Open
Show simple item record

Google ScholarTM

Check

Altmetric

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.