Please use this identifier to cite or link to this item: https://ah.lib.nccu.edu.tw/handle/140.119/100743
題名: Time Analysis for Planning a Path in a Time-Window Network
作者: 唐揆
Chen, Y.L.;Shaio, L.J.;Tang, Kwei
貢獻者: 企管系
關鍵詞: network; time-window constraint; time analysis
日期: Aug-2003
上傳時間: 25-Aug-2016
摘要: A systematic method is proposed to generate time information on the paths and nodes on a time-window network for planning and selecting a path under a constraint on the latest entering time at the destination node. Specifically, three algorithms are proposed to generate six basic time characteristics of the nodes, including the earliest and latest times of arriving at, entering, and departing from each node on the network. Using the basic time characteristics, we identify inaccessible nodes that cannot be included in a feasible path and evaluate the accessible nodes’ flexibilities in the waiting time and staying time. We also propose a method for measuring adverse effects of including an arc. Finally, based on the time characteristics and the proposed analyses, we develop an algorithm that can find the most flexible path in a time-window network.
關聯: Journal of Operational Research Society, 54(8), 860-870
資料類型: article
DOI: http://dx.doi.org/10.1057/palgrave.jors.2601583
Appears in Collections:期刊論文

Files in This Item:
File Description SizeFormat
860-870.pdf264.91 kBAdobe PDF2View/Open
Show full item record

Google ScholarTM

Check

Altmetric

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.