Please use this identifier to cite or link to this item:
https://ah.lib.nccu.edu.tw/handle/140.119/70635
題名: | Maintenance Outsourcing of a Multi-process Manufacturing System with Multiple Contractors | 作者: | 唐揆 Tang, Kwei |
貢獻者: | 企管系 | 日期: | 2006 | 上傳時間: | 16-Oct-2014 | 摘要: | Consider a manufacturer with a manufacturing system that consists of multiple processes. The manufacturer`s revenue is determined by the minimum of the uptimes among the processes. The maintenance functions of the processes are outsourced to independent contractors so that each contractor is responsible only for one process. A performance-based incentive contract is offered to each contractor, consisting of an uptime target level and a bonus rate for exceeding the uptime target. Under the incentive contract, a contractor receives a bonus only when the achieved uptime exceeds the target level specified in the contract. We develop a model for jointly determining the uptime target levels and bonus rates for the contractors which maximize system profit. We also demonstrate the financial benefits of coordination and added flexibility in allocating the additional profit to the contractors. In addition we show the impact of the variation in individual process maintenance times and costs on channel coordination and profits. | 關聯: | IIE Transactions, 38(1), 67-78 | 資料類型: | article | DOI: | http://dx.doi.org/10.1080/07408170500243328 |
Appears in Collections: | 期刊論文 |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
index.html | 124 B | HTML2 | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.