Please use this identifier to cite or link to this item: https://ah.lib.nccu.edu.tw/handle/140.119/76109
題名: An optimization model for precast project planning using group concepts
作者: Shih, Kuo-Chuan;Liu, S.-S.
施國銓
貢獻者: 經濟系
關鍵詞: Construction; Group; Optimization; Precast project; Project planning
日期: Sep-2010
上傳時間: 29-Jun-2015
摘要: Construction projects adopting precast pieces are feasible to reduce project uucertainties over components which are produced in factories, stored in factories or external sites, and transported with trucks to satisfy installation demand. In order to create project plans, planners should arrange available resources and select appropriate ways to produce, store, and transport components. This study adopts several group ideas to organize an overall precast project. Based on these group concepts, an optimization model and a recursive procedure are proposed. Appropriate molds and zones can be determined in the recursive procedure, and the project plan can be created through the optimized project cost. An example experiment is demonstrated to explain the feasibility of the proposed model and group concepts. © 2010 The Operations Research Society of Japan.
關聯: Journal of the Operations Research Society of Japan, 53(3), 189-206
資料類型: article
Appears in Collections:期刊論文

Files in This Item:
File Description SizeFormat
189-206.pdf1.41 MBAdobe PDF2View/Open
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.