dc.contributor.author (作者) | 洪叔民 | zh_TW |
dc.creator (作者) | 洪叔民 | - |
dc.date (日期) | 2007 | en_US |
dc.date.accessioned | 14-九月-2009 09:48:48 (UTC+8) | - |
dc.date.available | 14-九月-2009 09:48:48 (UTC+8) | - |
dc.date.issued (上傳時間) | 14-九月-2009 09:48:48 (UTC+8) | - |
dc.identifier (其他 識別碼) | G0094933013 | en_US |
dc.identifier.uri (URI) | https://nccur.lib.nccu.edu.tw/handle/140.119/31332 | - |
dc.description (描述) | 碩士 | zh_TW |
dc.description (描述) | 國立政治大學 | zh_TW |
dc.description (描述) | 國際經營管理英語碩士學位學程(IMBA) | zh_TW |
dc.description (描述) | 94933013 | zh_TW |
dc.description (描述) | 96 | zh_TW |
dc.description.abstract (摘要) | In a highly competitive industry such as semiconductor, enterprises are often faced with the constant challenge in change management that includes product technology, organization re-engineering, system migration or enhancement. How can the organizations quickly adapt to the path of the evolvement in its environment and ensure the competitive advantage in the meantime is a critical challenge for enterprises to achieve. In November 2001, Vishay Intertechnologies, one of the worldâs largest manufacturers of discrete semiconductors announced the acquisition of General Semiconductor (the largest producer of low-to-medium power rectifiers and Transient Voltage Suppressor diodes) and assigned its core business to a new Power Diodes Division with its business headquarters located in Taipei. Along with the acquisition, the newly formed organization Power Diodes Division is faced with an immediate challenge on resource reallocation and rearrangement as well as product portfolio consolidation. The new organization needs to be re-introduced to its customers and to the market with the same quality and performance guaranteed. This study introduces and reviews one of the major changes Power Diode Division had gone through: ERP system integration. Throughout the project, there are organizational realignment and critical business process that had been reviewed with a strict time-event schedule. The result of this integration project not only represents the capability of this organization response to the changes, but also the key performance measurement to the acquisition implementation. Through in-depth interviews and literature reviews, the thesis will closely examine the process of the ERP integration and the major obstacles encountered during this practice. The entire ERP integration project will be reviewed under the research framework on strategy, technology, organization, people and environment. Also how business process mapping into the system will be recorded and discussed throughout the paper accordingly. Ultimately, this paper will review the lessons learned during the integration process as well as the experiences gained from it. This can be used as a case study for companies going through merger with system consolidation task or a case study on the industrial supply chain environment. | en_US |
dc.description.abstract (摘要) | LIST OF FIGURES VI CHAPTER 1 INTRODUCTION 1 1.1 RESEARCH MOTIVE 1 1.2 RESEARCH OBJECTIVE 2 1.3 TERMINOLOGY DEFINITION 3 1.3.1 Build to Order 4 1.3.2 Build to Stock 5 1.3.3 Enterprise Resource Planning System 6 CHAPTER 2 LITERATURE REVIEW AND RESEARCH METHOD & FRAMEWORK 9 2.1 LITERATURE REVIEW 9 2.1.1 STOPE Analysis in ERP system integration 9 2.1.2 GAP Analysis 12 2.1.3 Critical Path Method 14 2.1.4 Value Chain Analysis 17 2.2 RESEARCH METHOD AND FRAMEWORK 20 2.2.1 Primary Data Review 21 2.2.2 Secondary Data Review 21 2.2.3 Research Framework 22 CHAPTER 3 VISHAY POWER DIODE DIVISION OVERVIEW 23 3.1 VISHAY PDD HISTORY 23 3.2 VISHAY PDD PRODUCT INTRODUCTION 24 3.3 VISHAY PDD CUSTOMER BASE 27 3.3 VISHAY PDD ORGANIZATION STRUCTURE AND ERP SYSTEM 30 CHAPTER 4 SYSTEM INTEGRATION AND BUSINESS PROCESS 34 4.1 VISHAY PDD ERP SYSTEM INTEGRATION PHASE REVIEW 34 4.2 PROCESS AND SYSTEM AVAILABILITY MAPPING 38 4.3 BTO AND BTS IN PRACTICE 41 4.4 IMPLEMENTATION AND CHALLENGES 48 4.4.1 Consignment Management 50 4.4.2 Line Transfer Project 55 4.4.3 New Product Development 56 CHAPTER 5 CONCLUSIONS 58 5.1 RESEARCH FINDINGS 58 5.1.1 Strategy Review 58 5.1.2 Technology Review 60 5.1.3 Organization Review 61 5.1.4 People Review 62 5.1.5 Environment Review 65 5.2 KEY LEARNING 66 5.2.1 Organization and ERP system 66 5.2.2 Business Process and ERP system 67 5.2.3 Planning for System Integration Project 68 5.3. SUMMARY 69 REFERENCES 72 List of Figures FIGURE 1.1 : BASIC ERP MODULES 7 FIGURE 2.1 : STOPE VIEW ON ERP SYSTEM IMPLEMENTATION 10 FIGURE 2.2 : A STOPE VIEW: DEVELOPMENT TOWARDS THE E-GOVERNMENT SYSTEM 11 FIGURE 2.3: TYPICAL GAP ANALYSIS MODEL 12 FIGURE 2.4 : CPM PRECEDENCE DIAGRAM 16 FIGURE 2.5 : CPM PROJECT NETWORK DIAGRAM 16 FIGURE 2.6: CPM DETERMINATION CALCULATION EXAMPLE 16 FIGURE 2.7: THE VALUE CHAIN 18 FIGURE 2.8: RESEARCH FRAMEWORK 21 FIGURE 3.1 : GENERAL SEMICONDUCTOR HISTORY 24 FIGURE 3.2 : VISHAY PDD RECTIFIER MARKET SHARE IMS RESEARCH RESULT YEAR 2007 25 FIGURE 3.3 : VISHAY PDD TVS MARKET SHARE IMS RESEARCH RESULT YEAR 2007 27 FIGURE 3.4 : PDD CUSTOMER SEGMENTS BASED ON Y2007 REVENUE RESULT 27 FIGURE 3.5: PDD SALES REGION PERFORMANCE BASED ON ANNUAL REPORT FROM 2002 TO 2007, 2008 NUMBER IS A FORECAST REVENUE BASED ON Q108 FINANCE REPORT. 29 FIGURE 3.6: PDD SALES CHANNEL REVENUE DISTRIBUTION FROM YEAR 2002 THROUGH 2007 30 FIGURE 3.7: GENERAL SEMICONDUCTOR ORGANIZATION STRUCTURE 31 FIGURE 3.8: VISHAY INTERTECHNOLOGIES ORGANIZATION STRUCTURE 31 FIGURE 4.1: BUSINESS PROCESS MASTER LIST PAGE ONE 38 FIGURE 4.2: BUSINESS PROCESS MASTER LIST PAGE TWO 39 FIGURE 4.3:ORDER THROUGH DELIVERY FLOW IN JDE FOR GENERAL SEMICONDUCTOR 42 FIGURE 4.4:ORDER THROUGH DELIVERY FLOW IN SAP FOR VISHAY INTERTECHNOLOGIES 43 FIGURE 4.5:ENHANCED BTO HANDLING FLOW IN SAP FOR VISHAY INTERTECHNOLOGIES 44 FIGURE 4.6:BTO ORDER HANDLING FLOW IN PRODUCTION 45 FIGURE 4.7:STO SOLUTION FOR FORECAST ORDER HANDLING 52 FIGURE 5.1 1998 SURVEY OF 62 FORTUNE 500 COMPANIES 70 | - |
dc.description.tableofcontents | LIST OF FIGURES VI CHAPTER 1 INTRODUCTION 1 1.1 RESEARCH MOTIVE 1 1.2 RESEARCH OBJECTIVE 2 1.3 TERMINOLOGY DEFINITION 3 1.3.1 Build to Order 4 1.3.2 Build to Stock 5 1.3.3 Enterprise Resource Planning System 6 CHAPTER 2 LITERATURE REVIEW AND RESEARCH METHOD & FRAMEWORK 9 2.1 LITERATURE REVIEW 9 2.1.1 STOPE Analysis in ERP system integration 9 2.1.2 GAP Analysis 12 2.1.3 Critical Path Method 14 2.1.4 Value Chain Analysis 17 2.2 RESEARCH METHOD AND FRAMEWORK 20 2.2.1 Primary Data Review 21 2.2.2 Secondary Data Review 21 2.2.3 Research Framework 22 CHAPTER 3 VISHAY POWER DIODE DIVISION OVERVIEW 23 3.1 VISHAY PDD HISTORY 23 3.2 VISHAY PDD PRODUCT INTRODUCTION 24 3.3 VISHAY PDD CUSTOMER BASE 27 3.3 VISHAY PDD ORGANIZATION STRUCTURE AND ERP SYSTEM 30 CHAPTER 4 SYSTEM INTEGRATION AND BUSINESS PROCESS 34 4.1 VISHAY PDD ERP SYSTEM INTEGRATION PHASE REVIEW 34 4.2 PROCESS AND SYSTEM AVAILABILITY MAPPING 38 4.3 BTO AND BTS IN PRACTICE 41 4.4 IMPLEMENTATION AND CHALLENGES 48 4.4.1 Consignment Management 50 4.4.2 Line Transfer Project 55 4.4.3 New Product Development 56 CHAPTER 5 CONCLUSIONS 58 5.1 RESEARCH FINDINGS 58 5.1.1 Strategy Review 58 5.1.2 Technology Review 60 5.1.3 Organization Review 61 5.1.4 People Review 62 5.1.5 Environment Review 65 5.2 KEY LEARNING 66 5.2.1 Organization and ERP system 66 5.2.2 Business Process and ERP system 67 5.2.3 Planning for System Integration Project 68 5.3. SUMMARY 69 REFERENCES 72 List of Figures FIGURE 1.1 : BASIC ERP MODULES 7 FIGURE 2.1 : STOPE VIEW ON ERP SYSTEM IMPLEMENTATION 10 FIGURE 2.2 : A STOPE VIEW: DEVELOPMENT TOWARDS THE E-GOVERNMENT SYSTEM 11 FIGURE 2.3: TYPICAL GAP ANALYSIS MODEL 12 FIGURE 2.4 : CPM PRECEDENCE DIAGRAM 16 FIGURE 2.5 : CPM PROJECT NETWORK DIAGRAM 16 FIGURE 2.6: CPM DETERMINATION CALCULATION EXAMPLE 16 FIGURE 2.7: THE VALUE CHAIN 18 FIGURE 2.8: RESEARCH FRAMEWORK 21 FIGURE 3.1 : GENERAL SEMICONDUCTOR HISTORY 24 FIGURE 3.2 : VISHAY PDD RECTIFIER MARKET SHARE IMS RESEARCH RESULT YEAR 2007 25 FIGURE 3.3 : VISHAY PDD TVS MARKET SHARE IMS RESEARCH RESULT YEAR 2007 27 FIGURE 3.4 : PDD CUSTOMER SEGMENTS BASED ON Y2007 REVENUE RESULT 27 FIGURE 3.5: PDD SALES REGION PERFORMANCE BASED ON ANNUAL REPORT FROM 2002 TO 2007, 2008 NUMBER IS A FORECAST REVENUE BASED ON Q108 FINANCE REPORT. 29 FIGURE 3.6: PDD SALES CHANNEL REVENUE DISTRIBUTION FROM YEAR 2002 THROUGH 2007 30 FIGURE 3.7: GENERAL SEMICONDUCTOR ORGANIZATION STRUCTURE 31 FIGURE 3.8: VISHAY INTERTECHNOLOGIES ORGANIZATION STRUCTURE 31 FIGURE 4.1: BUSINESS PROCESS MASTER LIST PAGE ONE 38 FIGURE 4.2: BUSINESS PROCESS MASTER LIST PAGE TWO 39 FIGURE 4.3:ORDER THROUGH DELIVERY FLOW IN JDE FOR GENERAL SEMICONDUCTOR 42 FIGURE 4.4:ORDER THROUGH DELIVERY FLOW IN SAP FOR VISHAY INTERTECHNOLOGIES 43 FIGURE 4.5:ENHANCED BTO HANDLING FLOW IN SAP FOR VISHAY INTERTECHNOLOGIES 44 FIGURE 4.6:BTO ORDER HANDLING FLOW IN PRODUCTION 45 FIGURE 4.7:STO SOLUTION FOR FORECAST ORDER HANDLING 52 FIGURE 5.1 1998 SURVEY OF 62 FORTUNE 500 COMPANIES 70 | zh_TW |
dc.language.iso | en_US | - |
dc.source.uri (資料來源) | http://thesis.lib.nccu.edu.tw/record/#G0094933013 | en_US |
dc.subject (關鍵詞) | 威世通用半導體個案分析 | zh_TW |
dc.title (題名) | ERP系統整合與企業流程研究─威世通用半導體個案分析 | zh_TW |
dc.title (題名) | ERP system integration and business process review - Vishay general semiconductor power diode division case study | en_US |
dc.type (資料類型) | thesis | en |
dc.relation.reference (參考文獻) | Amit, R. & Zott, C. (2001). Value Creation in E-business, Strategic Management Journal, 22(3), pp.15â20. | zh_TW |
dc.relation.reference (參考文獻) | Bakry, A. H. & Bakry, S.H., (2005). Enterprise Resource Planning: a Review and a STOPE View, International Journal of Network Management, 15(4), pp. 363â370. | zh_TW |
dc.relation.reference (參考文獻) | Bakry, S.H., (2004). Development of E-government: a STOPE View, International Journal of Network Management, 14(2), pp.339â350. | zh_TW |
dc.relation.reference (參考文獻) | Bancroft, N., Seip, H. & Sprengel, A. (1998). Implementing SAP R/3: How to Introduce a Large System into a Large Organization (2nd ed.). Greenwich: Manning Publications. | zh_TW |
dc.relation.reference (參考文獻) | Blain. J. (1997). Special Edition: Using SAP R/3 (2nd ed.). Indianapolis: ASAP World Consultancy. | zh_TW |
dc.relation.reference (參考文獻) | Brown, C. & Vessey, I. (1999). Enterprise Resource Planning Systems: An Investigation of the Adoption Decision and Implementation Strategies, Lattanze Center for Executive Studies in Information Systems, Loyola University, Baltimore. | zh_TW |
dc.relation.reference (參考文獻) | Brown, C. & Vessey, I. (1999). ERP implementation approaches: Toward a contingency framework. International Conference on Information Systems, Charlotte, North Carolina. | zh_TW |
dc.relation.reference (參考文獻) | Davenport, T. (1998). Putting the Enterprise into the Enterprise System, Harvard Business Review, 76(4), pp.121â131. | zh_TW |
dc.relation.reference (參考文獻) | Holweg, M. & Pil, F. (2001). Successful Build-to-Order Strategies start with the Customer, MIT Sloan Management Review, 43(1), pp.74â83. | zh_TW |
dc.relation.reference (參考文獻) | Holweg, M. & Pil, F. (2004). The Second Century: Reconnecting Customer and Value Chain through Build-to-Order, Cambridge: The MIT Press. | zh_TW |
dc.relation.reference (參考文獻) | IMS Research Report (2007). Avalanche Diodes and TVS Thyristors & IMS The WW Market for Power Semi Discrete & Modules. | zh_TW |
dc.relation.reference (參考文獻) | Kerzner, H. (2003). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (8th ed.). Ohio: Wiley. | zh_TW |
dc.relation.reference (參考文獻) | Kreitner, R. & Kinicki, A. (2004). Organizational behavior, New York: Irwin Professional Publication. | zh_TW |
dc.relation.reference (參考文獻) | Liberzon, V. (2006) Resource Critical Path Approach to Project Schedule Management. Romania: Spider Management Technologies. | zh_TW |
dc.relation.reference (參考文獻) | Management of CPM schedule, (2008) Retrieved June 25th 2008, from Ronwinter Consulting Web site: www.ronwinterconsulting.com/rasubmit.htm. | zh_TW |
dc.relation.reference (參考文獻) | Mather, H. (1986). Design, Bill-Of-Materials, And Forecasting â the Inseparable Threesome, Production and Inventory Management Journal, 27(1), pp. 90â107. | zh_TW |
dc.relation.reference (參考文獻) | McShane, S.L. & Von Glinow, M. (2005). Organizational behavior: Emerging realities for the workplace revolution, New York: Irwin/McGraw-Hill. | zh_TW |
dc.relation.reference (參考文獻) | Monk, E. & Wagner, B. (2006). Concepts in Enterprise Resource Planning, Boston: Course Technology. | zh_TW |
dc.relation.reference (參考文獻) | Monk, E. & Wagner, B. (2006). Marketing Information Systems and the Sales Order Process. Concepts in Enterprise Resource Planning (2nd ed.). Boston: Course Technology. | zh_TW |
dc.relation.reference (參考文獻) | MRP/MRPII/ERP/ERM - Confusing Terms and Definitions for a Murkey Alphabet Soup (2008), Retrieved on May 25th 2008, from Wlug Organization Web site: http://www.wlug.org.nz/EnterpriseSpeak. | zh_TW |
dc.relation.reference (參考文獻) | Porter, M. (1985). Competitive Advantage: Creating and Sustaining Superior Performance, New York: The Free Press. | zh_TW |
dc.relation.reference (參考文獻) | Project Management Institute (2003). A Guide To The Project Management Body Of Knowledge (3rd ed.). California: Project Management Institute. | zh_TW |
dc.relation.reference (參考文獻) | Rectifier Circuit (2008), Retrieved June 7th 2008, from All About Circuits Web site: http://www.allaboutcircuits.com/vol_3/chpt_3/4.html. | zh_TW |
dc.relation.reference (參考文獻) | Ross, J. (1999). Surprising facts about implementing ERP, IT Professional, 1(4), pp.65â68. | zh_TW |
dc.relation.reference (參考文獻) | Satzinger, J. W.; Jackson, R. B. & Burd, S. D., (2004). Systems analysis and design in a changing world (3rd ed.). Boston: Benjamin/Cummings Publication. | zh_TW |
dc.relation.reference (參考文獻) | Transient Suppression Devices and Principles (2008), Retrieved May 30th , 2008 from Littelfuse Web site: http://www.littelfuse.com/data/en/Application_Notes/an9768.pdf. | zh_TW |
dc.relation.reference (參考文獻) | Traynor, I. (2007) Spotting New Niches In A Market. York: Blackwell Synergy. | zh_TW |
dc.relation.reference (參考文獻) | Urbig, D. (2003) The value chain`s values: Interpretations and Implications for firm and industry analysis, Berlin: Proceedings of Perspectives in Business Informatics Research. | zh_TW |