題名 A two-phase preventive maintenance policy considering imperfect repair and postponed replacement
作者 楊素芬
Yang, Su-Fen
Yang, Li;Ye, Zhi-sheng;Lee, Chi-Guhn;Peng, Rui
貢獻者 統計系
關鍵詞 Maintenance; Delay time; Imperfect repair; Postponed replacement; Performance-based contract
日期 2019-05
上傳時間 30-May-2022 16:03:11 (UTC+8)
摘要 This paper investigates a novel two-phase preventive maintenance policy for a single-component system with an objective of maximizing the revenue generated by the performance-based contracting (PBC). The system undergoes a defective state before failure, and produces signal hinting the condition. The maintenance policy consists of two phases: imperfect maintenance phase followed by postponed replacement phase. In the imperfect maintenance phase, inspection is performed to reveal the defective state, leading to a possible repair. Both the inspection and the repair are imperfect. In the postponed replacement phase, preventive replacement is performed during the upcoming scheduled maintenance window, before which no inspection or repair is executed. The expected net revenue under PBC is maximized via the joint optimization of the inspection interval, number of inspection and preventive replacement interval. We apply the model to a case from a steel converter plant, and the results show that our proposed maintenance policy outperforms some existing maintenance policies in terms of the net revenue.
關聯 European journal of Operational Research, 274(3), 966-977
資料類型 article
DOI https://doi.org/10.1016/j.ejor.2018.10.049
dc.contributor 統計系-
dc.creator (作者) 楊素芬-
dc.creator (作者) Yang, Su-Fen-
dc.creator (作者) Yang, Li;Ye, Zhi-sheng;Lee, Chi-Guhn;Peng, Rui-
dc.date (日期) 2019-05-
dc.date.accessioned 30-May-2022 16:03:11 (UTC+8)-
dc.date.available 30-May-2022 16:03:11 (UTC+8)-
dc.date.issued (上傳時間) 30-May-2022 16:03:11 (UTC+8)-
dc.identifier.uri (URI) http://nccur.lib.nccu.edu.tw/handle/140.119/140180-
dc.description.abstract (摘要) This paper investigates a novel two-phase preventive maintenance policy for a single-component system with an objective of maximizing the revenue generated by the performance-based contracting (PBC). The system undergoes a defective state before failure, and produces signal hinting the condition. The maintenance policy consists of two phases: imperfect maintenance phase followed by postponed replacement phase. In the imperfect maintenance phase, inspection is performed to reveal the defective state, leading to a possible repair. Both the inspection and the repair are imperfect. In the postponed replacement phase, preventive replacement is performed during the upcoming scheduled maintenance window, before which no inspection or repair is executed. The expected net revenue under PBC is maximized via the joint optimization of the inspection interval, number of inspection and preventive replacement interval. We apply the model to a case from a steel converter plant, and the results show that our proposed maintenance policy outperforms some existing maintenance policies in terms of the net revenue.-
dc.format.extent 106 bytes-
dc.format.mimetype text/html-
dc.relation (關聯) European journal of Operational Research, 274(3), 966-977-
dc.subject (關鍵詞) Maintenance; Delay time; Imperfect repair; Postponed replacement; Performance-based contract-
dc.title (題名) A two-phase preventive maintenance policy considering imperfect repair and postponed replacement-
dc.type (資料類型) article-
dc.identifier.doi (DOI) 10.1016/j.ejor.2018.10.049-
dc.doi.uri (DOI) https://doi.org/10.1016/j.ejor.2018.10.049-