dc.description.abstract (摘要) | 債法上的權利與義務,原則上只能以契約建立、變更或解除;單獨行為通常是不夠的。可是在工程承攬契約卻有所不同,為了要使工作之進行能把握時效,順利進行,當工作環境與預想不同時,必須給予定作人片面變更契約之權限。只不過此種片面變更契約權限,並非基於法律的規定,而是由於契約之約定。實務上最高法院也承認定作人片面變更契約之權限。本文從比較法角度觀察,說明此種片面變更權在範圍上應有所限制,並以我國發生的實際案例說明問題的解決方式。 | en_US |
dc.description.abstract (摘要) | According to Art. 311, (1) of the German Civil Code: “Unless otherwise stipulated by statute, a contract between the parties is necessary in order to create an obligation by legal transaction or to alter the content of an obligation.” Though Taiwan’s Civil Law does not have a similar regulation, we still have to take the same attitude toward this issue. However, in a contract for work, we have to give the owner the right to issue Change Orders, i.e., the right to change the content of the contract without the consent of the contractor, when the working conditions are not the same as planned, in order to expedite the work. This right is based on contract terms, not on Civil Law. This article analyzes the issue of Change Orders from an international perspective and through cases having occurred in Taiwan; it elaborates the limit of Change Orders and the problem of Cardinal Changes. The author tries to find a solution to the cases which have occurred in Taiwan. | en_US |
dc.format.extent | 736410 bytes | - |
dc.format.mimetype | application/pdf | - |
dc.language.iso | en_US | - |
dc.relation (關聯) | 法學評論 , 116, 1-45 | en_US |
dc.subject (關鍵詞) | 契約原則 ; 變更命令 ; 採購契約要項 ; 國際工程師協會 ; 土木工程標準契約條款 ; 紅皮書 ; 美國建築師協會 ; 工程變更 ; 施工變更指示 ; 二○○六年工程定作之採購與契約規範 ; 重大變更原則 ; 廢棄契約原則 | en_US |
dc.subject (關鍵詞) | Altering the content of an obligation to be based on contract ; Change orders ; Standard procurement contracts ; Federation internationale des ingenieurs-conseils ; FIDIC ; Conditions of contract for works of civil engineering construction ; Red book ; The American institute of architects ; Changes in the work ; Construction change directive ; German general terms of contract for works (VOB/B) 2006 ; Doctrine of cardinal change ; Doctrine of abandonment of contract | en_US |
dc.title (題名) | 工程承攬契約之重大變更 | zh_TW |
dc.title.alternative (其他題名) | The Cardinal Change of Construction Contract | en_US |
dc.type (資料類型) | article | en |