dc.contributor | 統計系 | |
dc.creator (作者) | Cheng, Tsung-Chi;Hsieh, P.-H.;Yang, Su-Fen | |
dc.creator (作者) | 鄭宗記;楊素芬 | zh_TW |
dc.date (日期) | 2011-09 | |
dc.date.accessioned | 8-Oct-2015 17:51:04 (UTC+8) | - |
dc.date.available | 8-Oct-2015 17:51:04 (UTC+8) | - |
dc.date.issued (上傳時間) | 8-Oct-2015 17:51:04 (UTC+8) | - |
dc.identifier.uri (URI) | http://nccur.lib.nccu.edu.tw/handle/140.119/78912 | - |
dc.description.abstract (摘要) | A vector autoregressive (VAR) model has become a popular multivariate monitoring technique for serially correlated observations often observed in practice. In this article, we examine, via a Monte Carlo approach, the effect of a shift in the model parameter and the sample size in both Phase I and Phase II schemes on control chart statistics, namely, different versions of Hotelling`s T2 when a VAR model is employed. The effects are reported and specific T 2 statistics under various sample sizes is recommended. © 2011 IEEE. | |
dc.format.extent | 176 bytes | - |
dc.format.mimetype | text/html | - |
dc.relation (關聯) | 2011 IEEE International Conference on Quality and Reliability, ICQR 2011, 論文編號 6031725, 278-282 | |
dc.subject (關鍵詞) | Auto regressive process; Control charts; Correlated observations; Hotelling`s T; Hotelling`s T<sup>2</sup> statistic; Model parameters; Monte Carlo approach; Multivariate monitoring; Phase I; Phase II; Sample sizes; Statistical quality control; Vector autoregressive model; Flowcharting; Sampling; Value engineering; Process control | |
dc.title (題名) | On the Hotelling T2 control chart for the vector autoregressive process | |
dc.type (資料類型) | conference | en |
dc.identifier.doi (DOI) | 10.1109/ICQR.2011.6031725 | |
dc.doi.uri (DOI) | http://dx.doi.org/10.1109/ICQR.2011.6031725 | |