Showing results 21 to 40 of 57
< previous
next >
Date | Title | Author(s) |
12-Feb-2015 | Developing a GP-based Framework for Knowledge Integration | 陳春龍; Kuo, Chan-Sheng;Hong, Tzung-Pei;Chen, Chuen-Lung |
12-Feb-2015 | Development of a strategic research plan for an academic department through the use of quality function deployment | 陳春龍; Chen, Chuen-lung;Bullington, Stanley F. |
12-Feb-2015 | Emerging organizational structure for knowledge-oriented teamwork using genetic algorithm | 陳春龍; Huang, Hsiao-Tzu;Chen, Chuen-Lung |
12-Feb-2015 | Genetic algorithms applied to the continuous flow shop problem | 陳春龍; Neppalli, Ranga V.;Aljaber, Nasser |
17-Jun-2015 | Genetic algorithms for the two-stage bicriteria flowshop problem | Chen, Chuen-lung;Gupta, Jatinder N. D.;Venkata Ranga Neppalli; 陳春龍 |
12-Feb-2015 | Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times | 陳春龍; Chen, Chun-Lung |
17-Jun-2015 | Integrating Multiple Knowledge Sources by Genetic Programming | Chen, Chuen-lung;Kuo, Chan-Sheng;Hong, Tzung-Pei; 陳春龍 |
1-Jun-2015 | New particle swarm optimization algorithm for makespan minimization in permutation flowshop sequencing | Chen, Tingyu;Chen, Chuenlung; 陳春龍 |
14-Aug-2017 | A review of data monetization: Strategic use of big data | 陳春龍; Liu, Chien Hung; Chen, Chuen Lun |
12-Feb-2015 | SCHEDULING A SINGLE MACHINE TO MINIMIZE TWO CRITERIA: MAXIMUM TARDINESS AND NUMBER OF TARDY JOBS | 陳春龍; Chen, Chuen-Lung;BULFIN, ROBERT L. |
12-Feb-2015 | Scheduling unit processing time jobs on a single machine with multiple criteria | 陳春龍; Chen, Chuen-lung;Bulfin, Robert L. |
12-Feb-2015 | Simulated annealing and the mapping problem: A computational study | 陳春龍; Hart, Stephen M.;Chen, Chuen-Lung |
8-Dec-2010 | The Phoebe’s六星級寵物旅館 | 林恕立; Lin,dennis |
17-Jun-2015 | To Build Telecare System Network Environment | Chen, Chuen-lung; 陳春龍 |
15-Jun-2010 | 亞太地區無紙化貿易最佳典範 | 史蘭亭; Say, Alicia |
8-Apr-2010 | 以啟發式方法解決具迴流性質之彈性流程式排程問題 | 陳俊吉; Chen, Chun Chi |
1-Mar-2022 | 企業轉型: 從傳統唱片公司至全娛樂經紀公司 | 何燕玲; Ho, Linda |
18-Apr-2007 | 利用快速禁忌搜尋法求解實際零工式生產排程 | 陳春龍 |
18-Apr-2007 | 利用瓶頸機器的選取以改善Job Shop排程 | 陳春龍 |
14-Sep-2009 | 印刷電路板工廠現場排程之研究 | 黃萱懿; Huang, Shuan-yi |