1986 |
支出稅制之研究 |
郭淑慧 |
thesis |
|
1987 |
外滙市場操作之研究 |
賴碧霞 |
thesis |
|
1989 |
會計方法變動對決策過程影響之研究 |
蔡佩芳 |
thesis |
|
1987-08 |
Stepwise Inspection in Bayesian Multiattribute Acceptance Sampling |
KWEI TANG、KWEI TANG、Plante, R.、KWEI TANG |
article |
web page(786)web page(1397) |
1988-06 |
Optimal Control of a Production Process Subject to AOQL Constraint |
KWEI TANG、KWEI TANG、O&apos, C.、Cinneide、KWEI TANG |
article |
web page(790)web page(3233) |
1988-10 |
Design of a Two Stage Screening Procedure Using a Correlated Variable |
KWEI TANG、KWEI TANG |
article |
web page(752)web page(1329) |
1987 |
Simple Rules for Combining Forecasts: Some Empirical Results |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(746) |
1989 |
Empirical Comparisons of Five Procedures for Combining or Selecting Forecasts |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(692) |
1985-10 |
A Comparison of Average and Discounted Cost Models for the Dynamic Lot Size Inventory Problem |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(1038) |
1987 |
Economic Design of a One-Sided Screening Procedure Using a Correlated Variable |
KWEI TANG、KWEI TANG |
article |
web page(837) |
1984 |
Multiattribute Bayesian Acceptance Sampling Plans for Screening and Scrapping Rejected Lots |
KWEI TANG、KWEI TANG、Plante, R.、KWEI TANG、Ravindran, A. |
article |
web page(666) |
1986 |
Multistage Multiattribute Acceptance Sampling in Serial Production Systems |
KWEI TANG、KWEI TANG、Plante, R.、KWEI TANG |
article |
web page(733) |
1987 |
Constructing and Maintaining a Beta Process Distribution for Bayesian Quality Audit Systems |
KWEI TANG、KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(773) |
1987 |
The Effects of Inspection Error on a Complete Inspection Plan |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(721) |
1989 |
A Two-sided Screening Procedure Using Several Correlated Variables |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(871) |
1987-01 |
AN ECONOMIC MODELING APPROACH FOR THE DETERMINATION OF MATERIALITY IN AUDITING |
KWEI TANG、KWEI TANG、Plante, R.、KWEI TANG |
article |
web page(757) |
1988-04 |
An Economic Model for Vendor Selection |
KWEI TANG、KWEI TANG |
article |
web page(707) |
1988-07 |
Selection of the Optimal Inspection Precision Level for a Complete Inspection Plan |
KWEI TANG、KWEI TANG、KWEI TANG |
article |
web page(763) |
1988 |
Economic Design of a Two-sided Screening Procedure Using a Correlated Variable |
KWEI TANG、KWEI TANG |
article |
pdf(583) |
1987-01 |
Estimating Low Process Average by Inverse Binomial Sampling |
KWEI TANG、KWEI TANG、KWEI TANG、KWEI TANG |
article |
pdf(491) |
1988-02 |
Economic Design of Product Specifications for a Complete Inspection Plan |
KWEI TANG、KWEI TANG |
article |
pdf(449) |
1986-06 |
Multiattribute Bayesian Acceptance Sampling Plans under Nondestructive Inspection |
KWEI TANG、KWEI TANG、Plante, R.、KWEI TANG |
article |
pdf(533) |
1988-08 |
Joint Determination of Optimal Inventory and Quality Control Policy |
KWEI TANG、KWEI TANG、KWEI TANG、KWEI TANG |
article |
pdf(515) |
1985 |
在科技變動下提高管理生產力之研究 |
黃柄富 |
thesis |
web page(316) |
1985 |
我國數據機產業之研究 |
黃信益 |
thesis |
web page(217) |